Font Size: a A A

KEH Company Machine Electric Control Cabinet Localization Project Cost Management Study By Earned Value Analysis Method

Posted on:2015-01-27Degree:MasterType:Thesis
Country:ChinaCandidate:C T HuangFull Text:PDF
GTID:2251330425984372Subject:Project management
Abstract/Summary:PDF Full Text Request
Since2011, because of the European debt crisis, the world economy remains in the doldrums and seems still last. At the same time, pressure of the same industry cost competitiveness becomes larger and larger, the customer requests about the delivery time and after service also become higher and higher, more and more manufactural enterprises try to change, in order to find a way for living and development. KEH Co.,Ltd is a wholly Amercian-owned enterprises, the AFM machine is the main product, it enjoys the very high prpularity in the field. But, as it is an inport machine, so its higher price and longer delivery time are the problems. As a means of improvement of core competitiveness, under the prrequisite of guaranteeing quality, KEH company decides to localize the machines instead of the original and mature ones, to enhance the equipment’s competitiveness. During the course of localization, the cost management is very important. As there are many kinds of factors and methods what can affect the cost management, how to manager the cost comprehensively and effectively, the decision-making process has a significant impact on the future development of enterprises.The article bases on the cost management theory and methods, combines the facts of control enclosure localization project in KEH company, analyzes the relationship between the cost control and the plan control in the control enclosure project by using the earned value analysis method, and bases on the analyzing results, brings out the solutions to cost control and improvement, proves that the companies can improve controlling the project cost by some effective ways, for example:invalid costs avoidance, the process optimization of project, etc, so that the achievement of company performance development can be gotten. Also, hope this article will be a sample, make the reference for the companies which are faced with the similar projects to find a way to solve the problem.
Keywords/Search Tags:Electric Control Cabinet Localization Project, Cost Management, Cost Control, Earned Value Analysis Method
PDF Full Text Request
Related items