| Land and water transport in the channel of port construction is an important hub,Identification and study of port area of hub of overall layout and design standard is animportant link in the design of the harbor, Hub port design on land and watertransportation channel and transport security has important engineering significance.This article provides an overview of hub harbor project research significance,historical background and the present situation of port construction, Expounds thenecessity of the research project.This paper describes the related concepts of port anddock,In accordance with the port and dock classification of typical foreign anddomestic port are analyzed and introduced,Thus the wharf structural types andadvantages and disadvantagesThis article through to the hub port two operation area of the basic situation, theanalysis of relevant conditions,Identifying the new Kang port construction ofport.According to the actual demand and long-term planning and to the port locationand weather conditions including the design datum, temperature and precipitation,wind, hydrology, topography and engineering geology and earthquake intensityparameter analysis, The port construction standard and scale, port handling technology,graphic design, hydraulic design and research content.This article through to the passenger and cargo volumeã€formã€time efficiencyã€annual operation daysã€yard disequilibrium coefficientã€container yard equipment boxpliesã€dismantling boxes ratioã€work schedules and other practical data acquisition andanalysis, The port cargo and the crane ship--cable car--flow mechanical systemstechnology〠Container loading and unloading by "hanging under the hanging"container handling technology, Determined by calculating the port berth capacityã€storage areaã€mechanical equipment and personnel and other parameters. This paperalso designs the relevant content of water wharfã€terrestrial freight yard layout.Through to analysis the elevation of wharfã€front depthã€Bottom elevationã€designwater level, design load, soil physical and mechanical properties of the study andwork characteristics,The port area using gravity wharfã€trapezoidal formã€dryconstruction of cast-in-place concrete and masonry structure construction form, It isobtained by calculating the design water level of the terminal self gravityã€the ship’smooring pierã€design and achievement of wharf stability. |