| CRE is a large state-owned transport enterprises,the advantage of CRE is comprehensivetransportation network.The network includes railway,highway,aviation and shipping.Theywork together to provide services for the customers.excellent service was accepted by thecustomers.With the continuous development of other companies,the competition becomes moreand more vigorous.Net point network plays a key role in How to resist the industry competition.Coping withcompetition,the first to do is to develop and improve the service network,therefore, in someeconomically underdeveloped areas,it is necessary to add operating point.This kind ofpractice not only improve the service network, but also boosting the regional economy.Thedistribution of Company’s existing network: economic developed regions, branchesdistributed widely. But in some remote areas, potential customers such as gansu, small cannot meet the demand of the local logistics service network coverage.The distribution ofexisting service network:the more developed area,the more outlets.But in some remoteareas,for example, in Gansu.The coverage area of the network is small,it can not meet theneeds of local people.CRE intends to set up branches in hexi area.This kind of practice not only improve theservice network, but also boosting the regional economy.The main city of hexi has Jiuquan,Wuwei, Zhangye, Jinchang,Jiayuguan.After comparison of other Analysis methods,we decided to choose entropy method.Thismethod can be used for multiple objects, the various indexes of evaluation. The evaluationresults of this method is more objective,with less interference from human factors.Accordingto the calculation steps, work out the Comprehensive evaluation of the value.According to thearrangement from big to small.selece Jiuquan, Wuwei, Zhangye,,Jiayuguan as the outletsincreaseing city.Branches add city was established,the next step is to determine the distribution route.inThis paper we choose saving algorithm for distribution route selection.The required data wasdistance from distribution pointsto demand points,and distance between each demandpoints.After the calculation, arrangement saving mileage from big to small, determine thereasonable distribution route.Finally,using jiayuguan as an example.selection the route of.distributionIn the futueroperation. |