Corps Nong Bashi Mosuowan Water Supply Engineering Research And Design

Posted on:2014-07-07Degree:MasterType:Thesis
Country:ChinaCandidate:X F XuFull Text:PDF
GTID:2252330401983094Subject:Water conservancy project
Abstract/Summary:PDF Full Text Request
Accompanied by economic growth and the increase in population as well as the improvement ofpeople’s living standards, the Corps NongBaShi Mosuowan existing urban water supply sources and watersupply facilities have been far can not meet the requirements of urban water demand. The water crisis hasbecome the constraints Corps Nong Bashi Mosuowan area of national economic development animportant factor.The research focuses on the region of Xinjiang Production and Construction Corps NongBaShiMosuowan water process water purification process, water conveyance process targeted a lot of theory andresearch analysis, based on proposed some resolve NongBaShi the Mosso methods and measures ofdrinking water for the rural residents of the Bay Area, take a look at how to improve the people’s demandfor drinking water. The Corps NongBaShi natural geographical conditions, economic conditions andinfluent water quality, water requirements, the first of the long-distance water pipe network layoutdetermine, after determining the scale of site, scale, or water supply and elect several processes as analternative elect the most suitable for the project’s actual merit select a suitable local ground situation andthe technical and economic comparison from the water, water purification, water engineering, detaileddesign, feasibility analysis, the most economical and reasonable overall water supply programs.Water Distribution Networks and the water purification plant design, in strict accordance with thewater purification plant design of water and the actual monitoring of water quality to the original designdata for the process to achieve the goal to "drinking water health standards"(GB5749-2006) standardreference to the domestic the current run similar the waterworks success of experience, research forMosuowan design a water purification plant process research and results include:1Water Distribution Networks design flow calculation form, three main pipe engineering HydraulicCalculation, water treatment plant at the trunk pipeline who pressed chart2The process flow diagram of the water purification plant, water plant floorplan, waterworks structuresflat profile design drawings. The waterworks water quality characteristics, different process of comparativeanalysis and appraisal, design process suitable for factory and the design given each processing stepprocess parameters.After analysis of a comparative demonstration investment estimate of83,192,600yuan,1211yuan percapita investment. The project design life of16years, the survey year) to2004(NongBaShi rural drinkingwater status quo the design level year2020as the base year. Project scale of the type Ⅰ rural drinkingwater safety project, a population of69,201people resolve unsafe drinking water, water supply scale10364m3/d Project is divided into three construction: a project building a water source and itswaterworks,incomes for tax at the water treatment plant, water sources water treatment plant to incomes for tax at thetrunk pipelines, incomes for tax at the water plant to148group water plant output dry pipe water branch tosolve148Mission unsafe drinking water to a population of19,962people. Second phase of construction Mosuowan automatic control system for drinking water safety projects, incomes for tax at the water plantto149group150group water supply mains,148groups,149groups,150Mission waterworks, solve149group150group drinking not safety population of21,131people. Phase III construction project missionfield waterworks pipe network to each company to resolve insecure population of28,108people.
Keywords/Search Tags:water supply projects, Mosuowan, hydraulic calculation
PDF Full Text Request
Related items