Font Size: a A A

Research On Start-up Strategy Of The General Contracting Enterprise Emergency Plan Based On Supply Chain Management

Posted on:2014-04-02Degree:MasterType:Thesis
Country:ChinaCandidate:L H WangFull Text:PDF
GTID:2252330422455317Subject:Civil engineering construction and management
Abstract/Summary:PDF Full Text Request
With the development of global economic integration, the competition of market is more and more intense. The mode of supply chain management with high efficiency and low energy consumption is gradually applied on the construction of general contracting enterprise. But the supply chain management of general contracting enterprise has big challenge,because of the particularity of building product and the complexity of the production process.In recent years, earthquake, tsunami, continuous heavy fog, dust storms and other natural disasters take place frequently, and there are also sudden accidents, major equipment failure, disruption in supply of materials and all kinds of crises often occurs in the supply of general contracting enterprise, Any kind of crisis among them broke out could lead to the normal business in the supply chain interruption,some enterprises even bankruptcy, bringing huge economic losses and casualties to general contracting enterprises.In recent years, business community and academia did a lot of research work in supply chain risk modeling,contingency plan management,emergency plan evaluation, emergency plan simulation exercise and so on. But there are little research on when and how to choose a best time to start-up the emergency plan after Supply chain crisis broke out, Therefore, In the face of the inevitable crises, the study of the supply chain system and every enterprises in the system how to start the emergency plan will undoubtedly become the most theoretical value and practical significance things.Firstly, this article introduces the basic theory of construction general contracting enterprise of the supply chain, including the concept, characteristics and application situation of construction general contracting enterprise of the supply chain. At the same time, This paper defines and analyzes factors that affects the stability of the general contract enterprise supply chain system from its own angle. and then using the online method to study the optimal start-up strategy of emergency response plan. Aiming at this problem,the models of start-up strategy about emergency plan in the supply chain node enterprise and supply chain system was established,And introducing competition rate to verify the effectiveness of the start-up strategy.This study shows that the start-up strategy presented in this article can effectively cope with the crisis event and minimize the loss the crisis may cause.But the start-up time is asynchronous between node enterprise and the whole supply chain When taking the whole supply chain as the research object. In order to solve this problem, this paper puts forward the coordination mechanism,and making the whole supply chain realizing the optimal response to crisis events.The study results have theoretical guidance and practical value.The study of this paper has set a foundation for the study of strategy to start-up emergency plan about general contracting enterprise based on supply chain management, At the same time,the study provides the referential analysis method for the construction general contracting enterprise based on supply chain management to respond effectively to the crisis event.
Keywords/Search Tags:general contracting business, supply chain, contingency plan, start-upstrategy
PDF Full Text Request
Related items