Research On Contract Risk Management In EPC General Contract Project

Posted on:2013-05-06Degree:MasterType:Thesis
Country:ChinaCandidate:J LinFull Text:PDF
GTID:2252330425471861Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
With the rapid development of our economy, engineering construction entered a prosperous development in the new period, project number and size increase and enlarge continuously in construction project contract, at the same time also produced corresponding change, the terms of the contract, the content is becoming more complex, increasing rule gradually in line with international standards. In the engineering general contract project management, engineering construction projects in the contract will face the complexity and diversity of risk, therefore, for the two parties of the contract, it is necessary to evaluate the risks of, avoid possible risk, contract risk control research to be imperative.First, elaborated the general contract management mode research and project contract risk management research significance, described in detail the research ideas, contents and methods, and introduces the contract management and risk management concepts and the theory content.Secondly, the EPC project contract related characteristics is summarized, and the selection of historical documents and field research and interviews for two risk identification method, establishes the EPC initial project risk list, in order to optimize EPC summed up the project contract risk, and carries on the reasonable classification, this article from the terms of the contract risk, contract risk and contract execution risk in three aspects of the classification analysis.Then, based on AHP and fuzzy comprehensive evaluation method of project contract risk evaluation model, elaborates the meanings of evaluation index and the method of data processing. On the contract risk analysis and evaluation based on the contract risk, according to the control principle, establish a multi-dimensional project contract risk response control system, and detailed control process and strategy.Finally, in the ZY project as an example, introduces the ZY project on the basis of this, the mathematical model of project contract risk evaluation, according to the evaluation results put forward reasonable control measures.Through theoretical analysis and example test and verify, designed to enable our country contractor take the contract risk management, and puts forward a set of feasible EPC project contract risk analysis, evaluation, control system, in order to improve the risk management of project contract.
Keywords/Search Tags:EPC, contract risk, risk identification, risk evaluation, risk control
PDF Full Text Request
Related items