Font Size: a A A

Application Of Construction Company Replacement Mechanism In A University Dormitory Construction Project Management

Posted on:2015-02-17Degree:MasterType:Thesis
Country:ChinaCandidate:L ZhaoFull Text:PDF
GTID:2252330428985437Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
The expansion in scale and infrastructure, highlights the contradiction ofdevelopment needs of universities and the relatively backward mode ofmanagement, university management with traditional management pattern ofconstruction project management in modern university infrastructure projects,has been unable to complete the desired management objectives, theproblems that the management of the construction project management isconfused.This paper summarizes the main problems of university infrastructureconstruction, a series of problems, including project planning, design,management, construction and so on, these main problems, improve theengineering cost of university infrastructure construction projects, to extend theconstruction period of the project, and unable to guarantee project quality. Inorder to solve the existing problems in the construction of infrastructure, in thispaper, the domestic and international construction project management modeof comparative analysis, combining the development features of theuniversities and the actual situation, proposed the introduction of constructioncompany in the infrastructure construction project management in thereplacement mechanism, and taking a student dormitory building constructionproject as an example the paper introduces the process of university,infrastructure construction project management under this new mode, analysisand comparison of the application of construction enterprise replacementmechanism for the management of construction projects, to reduce engineeringcost, shorten the construction period, obvious effect to improve the quality ofthe projects to achieve the desired management objectives.In the case of a university dormitory building project is divided into fivestages of management, namely,"planning and design phase, bidding phase,contract signing stage, supervision of construction stage and completion stage,and analysis of" the "supervision of construction stage" into "earthworkconstruction engineering, masonry, stone base on each floor of mainconstruction engineering construction engineering, doors and windows, roofingconstruction engineering, ground wall tile construction, supervise theconstruction of external wall insulation engineering", a sub project, on behalf ofthe school and the construction enterprise management process for the thorough careful inspection of the building market, the common measurementstandards of evaluation index values, and agreed to replace the constructionenterprise is not up to the standard in accordance with the contract, makesuccessfully completed under the joint supervision and coordination andsupervision of Party A and Party B the dormitory building project.Application of replacement mechanism the construction enterprise, basicto the main problems of university construction projects in the collegemanagement, all aspects of the real depth in project management, improvetheir management level, also makes the construction company in the profitmaximization must fulfill the contract, improve the management level ofconstruction enterprise, this kind of management mode is to introduce acompetition mechanism, the competition mechanism for the construction unitsand supervision of supervision of construction company, construction companyto supervise each other, mutual competition, this kind of management mode toimprove the production efficiency, shorten the construction period, reduceproject cost, in universities and construction company is a win-win.
Keywords/Search Tags:Construction company, Construction project, Exit mechanism, Projectmanagement
PDF Full Text Request
Related items