| Last decade, our country economy has a rapid expansion, and the real estate industry development accompanying. So far, it has become a pillar industry of national economy. But with The five regulations of country in2013, the real estate market regulation and control efforts to strengthen gradually, and also exacerbated by the real estate enterprise merger and reorganization. The majority of small and medium-sized real estate enterprises have many questions, such as poor management, weak competitiveness ability, and low resists risk. If without solve timely, all the above question will be eliminated by the market at any time.Project management theory and method play an important role in the sustained and healthy development of the real estate enterprises. Through the application of advanced idea of project management theory, all the above need the theory, so we can build the best products.Shanghai San Sheng Hong Ye Group is the top50real estate enterprises of our national. Our company encountered some difficulties and twists and turns in the process of rapid development. This paper based on its subsidiary cooperation Shenyang Yi Jing Lan Wan real estate co., LTD., main to find the certain problem exist in the management, and focus on these, then combine the actual situation of the company, to optimize of the project management mode. At last try to realize the purpose of improving the level of project management of real estate enterprise. It is the purpose of this article research.This paper is divided into five parts:the first part is introduction, mainly elaborated the research background, significance and main ideas. The second part is the literature review, based on the reference and discussion of present situation and development trend of domestic and international project management theory, in order to put forward the theory of real estate project management. The third part talk about the detail description of Shenyang Yi Jing Lan Wan project puts forward the problems existing in the project. The fourth section is to optimize the project management system from the quality cost control, building the new project management system and so on to do the analysis. In the fifth part is the conclusion part, mainly analysis of the problem and put forward reasonable suggestions. |