Font Size: a A A

Study On Improvement On Statistical Analysis Methods Of Steel Plate Centralized Purchasing Cost Of China FAW

Posted on:2014-06-07Degree:MasterType:Thesis
Country:ChinaCandidate:Y Z LiuFull Text:PDF
GTID:2269330425965391Subject:Business Administration
Abstract/Summary:PDF Full Text Request
In recent years, China’s economy has developed a lot. The automobile productionand sales surged the new highs repeatedly. The growth rate reached the top at the yearof2009and2010, and then leveled off. But the capacity of Automobile productionstill grows fast. Many new vehicle factories have been built up. It makes Chinaautomobile industry competition more vehemence. It is a challenge for automobileenterprises to cut the cost and keep profits.China FAW Group Corporation is a large automobile enterprise group. Due to themarket pressure and the needs out of the enterprise management, the department ofProcurement Center of FAW was set up at2008, and all steel purchasing in group hadbeen centralized in this department at2009, in order to enhance the control ofpurchasing resource, exploit the scale advantages to the full and reduce productioncosts.Steel plate centralized purchasing work has been made progress rapidly in lastfive years. But it also has to face some phenomenons: historical business data was notbeen made full use of for business decisions, and the MIS was not met the needs ofprice and cost statistical analysis. Because of the MIS, the methods of price and coststatistical analysis have some limitations. So it needs to do a lot by hand to finish thework of statistical and analysis.In this article, according to the practice, using statistical principle, MIS anddatabase technology, the author analyzes the problems existing in the work of steelplate centralized purchasing price and cost statistical analysis methods, and offer theimproving ways: Build database that include all the price information of suppliers.That makes it possible to do statistical and analysis with computer technology.Improve the methods of statistical analysis to increase productivity. In this article, theauthor also describes how the distribution influence on procurement costs.By building price database and improving statistical analysis methods, we canfinish the data manipulation with computer that we must finish by hand before. Wecan make the result more precisely and near the truth. We can work further and showmore information. We can enhance the effects of information exchange between different departments with the result of statistical and analysis.By building price database and improving statistical analysis methods, we drawsup the blue print for steel plate centralized purchasing work. It can support businessdecisions a lot. In the end, it can strengthen management; it can allocate resourcesreasonably; it can reduce production costs and increase profits.
Keywords/Search Tags:Steel plate for automobile, Centralized purchasing, Cost statistical analysis, Statistical principles, MIS
PDF Full Text Request
Related items