Font Size: a A A

Labor Recruitment And The Shelf Workers Management Research For Construction Enterprises

Posted on:2015-02-22Degree:MasterType:Thesis
Country:ChinaCandidate:C M BingFull Text:PDF
GTID:2269330428478855Subject:Business administration
Abstract/Summary:PDF Full Text Request
Since the global financial crisis in2008, in order to boost domestic demand, stimulate consumption, promote employment, to maintain stable social economic order, the four trillion investment plan is maded in our country, especially in infrastructure and engineering construction field. Infrastructure construction is the solid foundation on which all the activities of production and social life, is an important sign to measure a country’s industrialization level and ability, is the fundamental guarantee for the construction of the socialist market economy in our country. Roll out sharply as the construction of enterprise operation, tight market has brought a project contracting, under this background, the traditional construction enterprise labor employment pattern already could not meet the requirements of the new, the construction enterprise must find an optimization mode of construction organization, in order to improve the work efficiency, cost control, mining potential, increase economic benefits.This study based on the related theory of organization and management, combining with the author for many years experience in the management of China railway nine innings and the current practical problems in the construction field expounds a new innovation project management mode, namely the shelf team building mode. The best model in this mode the current project management, the application of this model can effectively solve a series of disadvantages brought by the traditional model of the subcontract, improve the internal control and management ability of construction enterprises, improve the engineering quality, reduce the security hidden danger, to realize the objective of the project construction controllability.This research mainly includes the following five each parts of contents:The first part, the paper expounds the construction enterprise team construction frame research background and literature review, this article the research contents, methods, significance and innovation points and deficiencies of simple context.The second part, it is in this paper, the related theoretical basis, including human resources theory, principal-agent theory and the theory of project management organization.The third part, the paper analyzes the work teams of subcontracting mode when the construction enterprises in our country, analyzes the traditional construction enterprise subcontracting mode; Present situation and the insufficiency of the construction of Chinese construction enterprise team shelf; And the problem of construction enterprise management mode in our country.The fourth part, theory combined with practice experience, proposed our country construction enterprise self-built shelves team to build model. This study also thought shelf team model to solve the problem of the construction of construction enterprises and the management way. Specifically elaborated the necessity of constructing self-built type rack team; Self-built type rack team construction principle; The design of the construction team construction plan; The operation of the construction team, control and management.The fifth part, it is combined with the personal experience in the practice of China railway nine innings, self-built shelves for China railway nine innings team practice problems and countermeasures are detailed analyzed.
Keywords/Search Tags:Construction enterprise, Labor model, The shelf team construction, China Railway No.9Group Co.,Ltd
PDF Full Text Request
Related items