| The risk management of aviation weapon equipment acquisition is an importantpart of its project management.These work can improve the efficiency of aviationweapons and equipment procurementã€Reduce procurement costsã€Ensure to providequalified weapon on required time。Although this area has a lot of domestic treatises,but they mainly focus on the acquisition of weapons and equipmentã€risk managementof weapons and equipment research, It seems not enough for specialized riskmanagement analysis to the aviation weapons and equipment. This paper study riskidentification and risk mitigation countermeasures of the aviation weapon acquisition.The main contents are as follows:1,The whole aviation armament procurement cycle is divided into eight stages asdemonstration projects, program design, project development, design stereotypes,manufacturing, armed forces, using security and decommissioning, Furtherdecomposition was given to these Eight stages. Aims at the different features of stagesof the whole aviation armament procurement cycle Conducted,This paper research therisk identification and find these risk factors types on the basis of content analysis,Finally, the results of the risk identification is given according to process.2, After it identified the risk of aviation Weapon acquisition based on process,thispaper give the risk estimates process of aviation Weapon Acquisition and introducedhow to use the Delphi method to determine the probability of occurrence of theidentified risk factors and hazards size. Then draw the risk graph and Risk measure iscalculated by the formula.3, In this paper, system dynamics knowledge was used to analysis the relationshipwith each other between technical risk, demand risk, contract risk, security risk, creditrisk, management risk, environmental risk, human risk organization and planning risk.4, On the basis of identified risk of aviation weapon acquisition,Givecircumvention measures aimed at aviation weapon equipment acquisition project riskaccording to the type of risk and procurement processes.The paper analyzed riskmeasures in detail, These countermeasure provide a reference for effective riskmanagement for procurement staff.5, This paper Order U.S. F-22advanced tactical fighter procurement project riskmanagement As an example, analied the case of how U.S. F-22procurement projects process was re-classified with milestone, Analyzed its significance, analyzed the riskF-22project planning, risk identification and risk control, Analyzed risk control inaccordance with stages. Finaly,it Concluded experience and inspiration from the F-22project. |