With the rapid development of the local economy, in order to meet growing demand forelectricity, the number of substations and transmission lines is increasing, after the failure ofthe power system, how to restore a timely and efficient grid operation has become a realproblem that we need to be solved. From the Shuangyashan grid reality, without affecting thesystem at the main station communication lines, through the establishment of a small masterstation to tune to set up a private network as the carrier, so that the area of fault recorderremote network communication failure data, and make full use of the data within the gridnetwork resources Shuangyashan all substation fault recorder networking, remote retrievalpretreatment and distance measuring equipment line fault data in order to establish thebackground analysis platform, unified management failure data. Shuangyashan grid throughthe practical application proves the proposed wave recording device networking systems tomore efficient and timely means of fault recorder function, quickly find the point of failure,provide a strong basis for fast and accurate power system fault exclusion. |