Schedule Management Research On Santai Town Transformer Substation Technical Renovation Project

Posted on:2015-11-12Degree:MasterType:Thesis
Country:ChinaCandidate:H ZhengFull Text:PDF
GTID:2272330434459668Subject:Project management
Abstract/Summary:PDF Full Text Request
Project schedule management as an important part of project management andproject safety, quality and cost management become the four essential factors of projectmanagement. Scientific and effective specified for project control plan and prepare theproject progress management, project construction is the important means. Engineeringproject schedule management throughout the whole process of project implementation,mainly including: project decision, design, construction and completion of each stage ofthe progress of the management and control.In this paper Santai of the substation technical renovation project as the main objectof study, the key to the project schedule management of each link management method,management tool and conduct the thorough research to the management process. First ofall, the study in this paper discusses the background, the present situation, significance,to carry out research in this paper provide a valid path; Secondly, based on analyzing theproject schedule management related theory, discusses the modern project managementtechnology, project management schedule definition and main contents of which providesthe theoretical basis in this paper. Again, according to the characteristics of the substationtechnical renovation project schedule management factors, process and time limit for aproject, Santai substation construction stage analysis of existing problems, and giveeffective solutions, through the schedule control theory, the organization measures suchas construction method is studied. Found in the research process, due to the constructionof the crossover operation is much, combined with the adjacent devices charged and thearrival of the goods will not be able to meet the needs of the current, etc., in a variety ofproblems hinder, we hope through the analysis of the critical path method and adjust theconstruction plan, which would be able to solve the problems existing in the construction,to ensure the quality to complete the construction task on schedule for the projectmanagement provides valuable practical experience.
Keywords/Search Tags:Transformer substation, technical renovation projects, schedule management
PDF Full Text Request
Related items