| With the rapid economic development and expanding the scale of capitalinvestment, the Chinese market for construction projects in the entire process ofproject cost control have become increasingly urgent. Project cost management mustachieve full integration with the international community, and project costmanagement must be managed from a new perspective and project cost control. Inthe construction of which, how to invest, how to make use of their limited cost. Thisis a very complex issue, because in the process of construction which there are toomany uncertain factors, these factors have a very significant impact on the cost of theproject, so it appeared in the profession of project cost to the project constructioncosts necessary to evaluate, for the entire construction of rational planning.Meanwhile, as the building construction business in the context of the new era, wemust realize the importance of strengthening construction cost budget control,especially in budgetary cost control personnel must be closely integrated constructioncost budget control points, the analysis leads to improper construction cost budgetcontrol causes, and to take effective measures to strengthen the construction sitechanges and economic visa controls.Firstly, the concept of the project cost and budget brief introduction, and then theproject background, the project decomposition analyzed, followed by the analysis ofits cost for DFJY project, preliminary research for the project and the feasibility of theuse of value engineering theory, tendering various theories and methods tender, limitdesign reasonable project cost is determined and pre-construction of steel, concreteand other indicators of the cost of a decisive influence on the strict control;construction process, an important material procurement of equipment, change thevisa process strictly; Upon completion of the settlement process and the results ofrepeated verification to ensure that the whole process DFJY reasonably determine thecost of the project and effectively controlled. Compare the cost of the project to provethe whole process is a useful attempt to control the cost of similar projects it is worthlearning and promotion through the economic benefit analysis. |