Font Size: a A A

Power Grid Construction And Planning Research About Yingde Yinghong Town Industrial Park

Posted on:2015-07-20Degree:MasterType:Thesis
Country:ChinaCandidate:T WangFull Text:PDF
GTID:2272330452960554Subject:Electrical engineering
Abstract/Summary:PDF Full Text Request
With the rapid domestic economic development, people态enterprise put forward higherrequest to electric reliability and power quality, low voltage distribution grip back wardincreasingly can not meet the requirements, low voltage distribution network should beupgraded. And in view of the central requirements and public opinion, a reasonable, scientific,economic good power grid planning, arrangement of power grid construction project, ensurethe safety, stability, reliability and economy of distribution network operation, fully in place toplay each of the funds become the core work of philosophy for the power supplyenterprise.The Yinghong Town has location advantages, only1.5hours drive south fromGuangzhou, north to Shaoguan50minutes, as a junction located between northwestmountain area in Guangdong and the Pearl River delta. The city as outside the nearestdistancein Pearl River Delta area, unique geographical advantages of Yinghong Townwithfirst come, first served", as "the Pearl River Delta economic circle" to grow, in theconstruction of Guangle highway and planning of the Kun Shan Expresswayacross theYinghong Town, in this intersection, Yinghong Town accept ability of Guangzhou QingyuanCity, radiation further enhanced, becoming Northwest Mountainous Area of GuangdongPearl River Delta and other economies to undertake industrial transfer pilot town, to the areato speed up bring newopportunity for the development of export-oriented economy. The localgovernment to attract foreign investment, in response to the provincial governmentputforward the "double shift" strategy, teamed up with Shunde City Hall buildGuangdongShunde Qingyuan (Yingde) Economic Cooperation Zone, a strong impetus to the localindustrial economy development.This thesis is in the "Twelfth Five Year Plan" period the foundation of the power gridconstruction, comprehensive data over ", to"1025"Yingde city power grid planningbased inShunde, Guangdong Qingyuan cooperation zone (Yingde)(hereinafter referred to as the"cooperation zone") planning overall goal of development as a guide, a reasonable plan toarrange The Yinghong town Guangdong Shunde.Qingyuan (Yingde) economic cooperation area power grid planning and constructionwork, study and improve the planning "grid two de" cooperation area,make it become to meetindustrial park construction and local economic development growth in demand, but also hashigh reliability and economic operation of the power grid investment. This paper fully investigation and analysis of structure characteristics of GuangdongProvince distribution network, combined with the actual development situation ofthe BritishRed Town "two virtues" cooperation area, reasonable scientific predictionon the future of theload, and as a data support, the construction of dynamicplanning of industrial parkconstruction planning of distribution network, reflected inlow voltage distribution networkprospective and science.
Keywords/Search Tags:loadforecast of industrial park, power grid construction, planning of powergridsubstation sites, route planning
PDF Full Text Request
Related items