Management Of Cost Control During The Construction Of Jiaojiang Bridge

Posted on:2015-05-09Degree:MasterType:Thesis
Country:ChinaCandidate:Y P WangFull Text:PDF
GTID:2272330461496677Subject:Business administration
Abstract/Summary:PDF Full Text Request
Project construction cost is the sum of all costs of construction enterprises for project construction and management, it is a comprehensive reflection of the situation of construction enterprises in the construction process throughout the project labor and material consumption, and is an important indicator of the outcome of the operation and management of construction enterprises. Currently construction enterprises generally face lower bid price, the tight schedule requirements, material prices and labor wages, construction funding constraints and other issues. In this situation, the construction enterprise projects must improve the overall cost-conscious management, strict cost control systems, strengthen the construction process control under the premise of ensuring the quality of construction in order to promote the sustainable development of enterprises.In this paper, cross road and bridge construction in East China Engineering Co. Jiaojiang Bridge construction project cost control problems. First, the characteristics and methods of analysis summarized the theory of construction project cost control, construction cost of the project structure, classification and control of the overall budget costs. Taking the Jiaojiang Bridge after a pilot, set up a budget to cover the full cost of table-based control scheme applies to the current construction enterprises provide a theoretical basis.Secondly responsible for years of experience in cost control, as well as Jiaojiang Bridge project cost control field research, analyze the status quo for the project cost control JIAOJIANG summarizes the current project cost control problems and causes.Again, for the Jiaojiang Bridge in cost control problems associated with the current theory of original programs and projects, project cost management and control, based on the estimated cost to set up a full set of table-based control improvement program.Finally, analysis of the situation and the application of cost control effect of this set of programs implemented in Jiaojiang Bridge after. The set of instructions to cost control sets the table-based improvement program is feasible, so that construction projects can be achieved in the course of a close collaboration with various departments, the company realized the project cost control management, cost control also provide a reference for other companies and reference.
Keywords/Search Tags:Construction project, cost control, Multiscale Analysis
PDF Full Text Request
Related items