Font Size: a A A

Research Of Datang (Chifeng) Renewable Power Co., Limited Operation And Maintenance Of Wind Farm Integration

Posted on:2016-05-25Degree:MasterType:Thesis
Country:ChinaCandidate:X BaiFull Text:PDF
GTID:2272330467497708Subject:Operational management
Abstract/Summary:PDF Full Text Request
As in nature,the wind can constantly renewable, sustainable use of energy, is akind of new great potential energy, with the inexhaustible characteristics and widelydistributed, not only suitable for local development and utilization, and will not causeany harm to the environment. In recent years, our country attaches great importanceto wind power, the focus of the country‘s new energy policy is to develop and speedup the development and utilization of wind power. As China continues to developthe use of wind power, wind power generation industry has increasingly become themain force of the pitch for the new generation, and has entered the stage ofdevelopment of large-scale wind farm capacity continues to expand, the proportion ofwind power in the grid is gradually increase.Datang new energy co., LTD.(chifeng) as a mainly wind power, activelypromote other clean energy development and utilization of new energy professionalcompany. As companies grow increasingly, are actively explore new ways windpower operation and management. Company set up since the start of the operation ofthe wind farm and the maintenance work is a professional management way,respectively, the separation of operations management. In order to better adapt to letwind farm grid interconnection regulation requirements, improve the reliability ofwind power equipment and operation quality, make the wind turbine to achieveoptimal state grid, produce greater economic benefit, but also consider the company’sown production cost control, and the scale of wind farm and the major developingtrend of business, using the scientific method to strengthen wind farm operationsmanagement is more and more important.Wind farm integration of operations management, refers to the respect for the wind power production safety, on the basis of objective laws, through the integrationof operations management, make ops member can complete the operation of windfarm equipment inspection, brake operation and accident treatment, can also completefan, lines of conventional missile d etection and maintenance work, realize the windfarm every production personnel have become\"operation, maintenance and control,a hillock pluripotent\" multiple high quality talents, eventually reach after windunattended less operational efficiency maximization, accumulation of solid capablehuman resources for the company at the same time, to implement a wind farm canindependently accomplish the great goal of operation, maintenance work.In this paper, for the wind farm operation, analysis the way of maintenanceand management,combining with the outstanding characteristics of domestic windpower management modes, expounds on the original state of operationsmanagement, using the method of contrast narrative wind separation operation,maintenance and operational integration management of the impact of the companyproduction and operation management, using system analysis method in this paper,the traditional way of separated operation, maintenance management of wind farms,the problems existing in the operation management knowledge analysis existencequestion, and by the methods of risk management, from personnel, system reform andspare parts reserve three aspects determine operational integration managementimplementation measures, finally USES the method of project management work toensure that the improved scheme. Through the method of literature reading to collecta lot of material, the combination of all the related department to arrange the data andinformation, integrating theory with practice, implements operations for wind farmintegration management for pre-assessment effect.
Keywords/Search Tags:Operational integration, human resources, equipment availability, operating costs
PDF Full Text Request
Related items