Font Size: a A A

Single Railway Section Passing Capacity Calculation And System Development

Posted on:2016-01-21Degree:MasterType:Thesis
Country:ChinaCandidate:X Q GuoFull Text:PDF
GTID:2272330467972817Subject:Systems Engineering
Abstract/Summary:PDF Full Text Request
In recent years, with the continuous economy development of railway in our country and railway construction of large-scale, accurate calculation of railway section passing capacity has an important significance to improve the railway passing capacity utilization and the level of train operation organization. In the process of capacity calculation, train operation organization of single track railway is more complicated than double track railways, so the paper focuses on single railway section passing capacity.Now using the deducting coefficient method to calculate capacity is not applicable to railway in our country already. Paper analyzed several capacity calculation methods, putting forward the minimum time interval and the minimal interval method of train diagram. The minimum time interval of train diagram was what considered train stop, passing and overtaking that generated extra interval occupied time.Paper analyzed the necessary factors related to the passing capacity in the calculation process, such as train running effective time, the minimal interval time of train diagram, running buffer time, and its calculation method. While in extra occupied interval time calculation, respectively analyzed and calculated the same direction of running train set and different direction train set. Then using the method of analysis and calculation of different running train set stop-schedule plan, got extra interval occupied time. And got the average train extra interval occupied time by averaging the total extra interval occupied time for each train set. At the same time, using Visual Studio2010programming development tools and the MySQL database, completed the development of the single track railway passing capacity system.Also, taking Jiaoxin line of Jinan Railway Bureau as an example, calculated standard line capacity and usage passing capacity, and then made comparative analysis with the actual operation of the train number.
Keywords/Search Tags:single track railway, railway passing capacity of block section, sectionoccupied, additional section time occupied
PDF Full Text Request
Related items