Font Size: a A A

God Ning Group Lingwu Mining Hydro Smart Grid Construction And Integrated Scheduling System Framework To Achieve

Posted on:2015-02-03Degree:MasterType:Thesis
Country:ChinaCandidate:J D ChenFull Text:PDF
GTID:2272330473954651Subject:Software engineering
Abstract/Summary:PDF Full Text Request
Currently, an important research direction is the smart grid power systems, it has a strong engineering background and applications, has huge market potential and trends. Intelligent scheduling smart grid network in the country and abroad are very hot key technologies, current research focuses on research hotspot smart programming and scheduling, including power distribution network is in normal operation, fault, overload under three conditions analysis and processing and scheduling strategy.In the intelligent scheduling network, network analysis, processing and dissemination of information is assigned to each node in the region, and with the best mode topology and network structure intelligent scheduling algorithm for error detection and isolation of the network is working properly, help fast functional smart grid implementation. In order to ensure the security and economic stability, and fast scheduling for specific areas and efficient operation of the electricity network, you need to quickly and accurately locate network faults when an error occurs, and rapid fault isolation in the region, in order to achieve control of the accident minimal impact on the region. This model describes the changes in the network structure will affect the operation of the actual wiring, electrical devices, and the following model number and distribution network node, optimizing the structure of the data, and to simplify the calculation of all these operations, and reduced to the computer memory requirements, to improve fault isolation and practical applications in the area provide a strong guarantee.Intelligent scheduling network, in the case of overload, both security and stability, it should be part of the region has been a lack of power. In order to realize the benefits of network optimization, the need to provide an algorithm to calculate regional energy priorities, taking into account the economic and political factors, mining and regional standardization ranking algorithm. When the existence of more than one hour power deficit, simply run the proposal to re- schedule ranking algorithm jurisdiction electricity grid units. Rated load by priority and to ensure that in the case of intelligent scheduling network overload, but also to ensure the security and stability of the grid, and ultimately improve the economic benefits and scheduling efficiency.Research and development and scheduling system based on the practical application of lingwu Hydro get very good results, and reduces the overall outage time and improve the final economic benefits.
Keywords/Search Tags:Smart grid, variable structure of the network model, fault location and isolation, overload scheduling
PDF Full Text Request
Related items