With the increasing maturity of the expressway ma intenance plan in China, relying on traditional experience to dete rmine the det ection sc heme of expr essway already ca n not meet the cur rent needs of the expressway maintenance.In order to cha nge our t raditional det ection scheme of t he expressway maintenance effectively, the paper re searches and sugges ts s ome reasonable detection schemes, aiming at the existing problems in t he expressway asphalt pavement detection program.This paper identifies t he major pa rt of expre ssway asphalt pavement reasonable te sting program works through theoretical analysis and pr act ical method of combini ng:the fi r st part introduces the indicatores of the reasonable maintenance dete cti on scheme for the expressway as phalt pavement comprehensively, with using the MinTab, SPSS software to research and a nalyze t he probability distri bution model a nd the variation level deepl y.These provide valuable re ference for researchi ng the impact on the pavement management from t he asphalt pavement performance eva luat ion 、 predicti on 、 de tection period and conducting other theoretical studies.Second, focusing on analyzing t he different sampling methods of the expressway asphalt pavement detections, confi rm the sc ope of application of different s ampl ing methods; through the in-depth comparative analysi s of different sampling data va r iat ion, get the conclusion that the whole se cti on det ection ca n be taken by the sampling detection; basing on es tabl ishing the road sampling model of the pa vement performance Indi cators, get the r oad sample size of the model of t he pave ment performance Indicators. Third, according to concentrate on the impa ct of the detection period for the mainte nance manageme nt, identify the detection period have a signifi cant impact on differ ent pa vement performance prediction, the boundary of t he uniform section road and disease developme nt.Finally, starting with economic factors, by me ans of the gr ey prediction techniques and r egress ion a nalysis, combining the sc ient ific theoretical and engi neering practice, de termine the rea sonable detec t period for different road detection Indicators from the maintena nce needs. |