| Since time immemorial, living is the most basic needs of humen. With the high-speed development of national economy, urban housing commercialization-process speed up day by day, the housing problem has already become the focus of the society. Since 1995, Our government started indemnificatory housing project for low-income urban residents. But because of limited land supply, lack of live engineering construction funds, slack of legal regulation and other reasons, the process of indemnificatory housing project for low-income urban residents development is relatively slow, people’s living are more prominent contradiction.In recent years, the country has issued a series of policy related to construction enough live engineering, alleviate low-income family housing difficulties. The engineering quality problems become the important problem of live engineering construction among them. Therefore, the research on how to use the advanced quality management and control method to ensure the quality of these live project has important practical significance.On the basis of data collection and compilation of relevant information on top of the domestic and foreign income housing projects theories and methods to conduct a comprehensive analysis and in-depth study. Combined with construction quality control theory to determine the indemnificatory housing project for low-income urban residents theory of quality management system in accordance with China’s specific national conditions, and actively explore the quality of indemnificatory housing project for low-income urban residents and the formation of the whole life cycle of the control process, control methods, strategies and measures. Jinan West Railway Station area to protect the quality of indemnificatory housing project for low-income urban residents to control the content of the second phase, the operation mode is analyzed, focusing on analysis of the implementation phase of quality control, and thus the introduction of AHP constructed project quality control evaluation system, the use of multi-stage fuzzy AHP system drawn Jinan West Railway Station area two indemnificatory housing project for low-income urban residents quality evaluation of the quality rating of "good", then clear up quality indicators grade, especially in the construction quality and acceptance of quality evaluation of the low score evaluation, the establishment of QC working group has focused on quality improvement and repair, proactive measures to address the problem is taken to achieve the quality control of projects to realize quality control. |