Changsha Ecological Park construction project implementation is the combination of multi-disciplinary background; long time span, a large area of large-scale construction projects, the quality of traditional project management is difficult to co-ordinate such a construction project, you must develop different quality management according to the different project phases programs in such demand background considerations, the design of a quality management program based process control to optimize existing projects construction program, hopes the project at the right quality, on schedule to complete the play a positive sense.In this paper, we firstly elaborated the research background, purpose and significance, analyzed the research and application of project quality management at home and abroad, and thus proposed this project research ideas, research methods, research framework; secondly, research and discusses the relevant point of project quality and quality management theory, defined the quality management work carried out during the set of processes and management tasks and other related content, pointed out several factors that affect the quality of construction projects:personnel, materials, construction methods, environment the impact of machinery and equipment management; and then, according to the municipal construction project in a different focus, the project is divided into three phases, and the principles of municipal construction project quality management, basic features and core focus of discussions; and finally, to Changsha ecological park construction project as an example, there is a problem on the basis of full investigation and analysis of the entire project as well as on the status of construction quality management, elaborated construction points deployed throughout the project and construction, research and proposed based on the early, middle and end of the three-stage quality control Highlights and content system construction, and on the whole project construction quality management and control of the implementation of safeguard measures were analyzed and discussed, and based on the quality control organization, engineering resources, construction process, construction of cultural management and other aspects of security measures to strengthen the construction standardization and standardization of project quality management system, so as to enhance the overall quality level of the project. |