Font Size: a A A

Application Of Design Procurement Construction(EPC) In Information System Construction Projects Of Bank

Posted on:2017-04-23Degree:MasterType:Thesis
Country:ChinaCandidate:K ZhangFull Text:PDF
GTID:2272330482489679Subject:Industrial engineering
Abstract/Summary:PDF Full Text Request
In recent years, China Postal Savings Bank rely on telecommunications, the rapid development of postal enterprises, has formed a unique culture and business enterprises, and stand out in a number of commercial banks, with a considerable part of the customer base and relatively unique profit model. Application of EPC mode postal savings information system, through clear responsibilities, and remarkable achievements of the contract, a clear relationship between the owner and the contractor, the owner’s organization to facilitate the work of coordination, so that commercial banks to focus on its core business, reduce information system construction costs. EPC Mode can guarantee the quality of the project under the premise of significantly shorten the construction period by organic complex design and construction of these two phases. On the basis of relevant research at home and abroad, this paper presents a model used in the process and implementation of the EPC method bank information system construction, describes the main responsibilities of the owners in this mode and the corresponding quality management, cost management, schedule management requirements. On this basis, this paper Liaoning China Postal Savings Bank branch to the case, the project schedule management, cost management, quality management, risk management, in-depth research, and EPC mode in the design phase of the project, procurement and construction phase implementation and application stage were analyzed. Finally, the paper summarizes the successful experience of the project as well as further optimization strategy.
Keywords/Search Tags:The EPC mode, The information system of bank, The project management
PDF Full Text Request
Related items