Research On Cost Control Of Chinese Learning Center Project

Posted on:2016-10-16Degree:MasterType:Thesis
Country:ChinaCandidate:F R XuFull Text:PDF
GTID:2272330482955003Subject:Project management
Abstract/Summary:PDF Full Text Request
Chinese classics center, is China’s national studies show, research, and the highest institution of education, to carry forward traditional Chinese culture heritage, the burden of responsibility and foreign cultural exchanges and integration, to show the Chinese splendid culture and brilliant art center at home and abroad Built in the center of Beijing Olympic park core Chinese &western project building modelling is novel and unique, construction scale, contract cost 883.9808 million yuan, engineering design, construction technology is complex, high standard is difficult. And construction period than the fixed period shorten a third, still with national quality engineering "luban prize" for the engineering quality target.The construction period, quality and cost as a core project management three elements, the three complement each other How to shorten the construction period, with limited cost to complete the high standards of quality project, we become one of the research topic.The winning Chinese &western center of Beijing urban construction group after project construction general contracting construction contract, set up the Chinese learning center project department Project department will first Chinese learning center project engineering situation has made the detailed description, in the case of a fully research on the project, the key points and difficulties in construction of the project organization and management is analyzed, and put forward the methods and measures to solve the problem, and effective technical measures to ensure the contract time limit for a project targets and to achieve the goals of quality, clear project cost during the construction of the reality and the existing problems Chinese learning center projects department in accordance with the project method to construction general contracting of project, under the leadership of project manager, project department research contracts and cost responsibility of compiling the Chinese learning project cost plan, at the same time, the related cost index decomposition after issued to the responsible departments and persons responsible. Secondly, combining with Chinese learning center of the project of construction project cost management and cost control theory is expounded and the research, focus on the basis of cost control and the principle, how to cost control under the condition of big principle to choose suitable for the cost of the project analysis method, in order to further explore project construction cost control to provide a solid theoretical basis.Again, the paper expounds Chinese learning center problems in the operation of the project cost, find out the reasons. Construction project is located in the key on a line project, the contract time limit for a project, quality goal and cost has important influence. By using the method of earned value analysis of construction project cost deviation, find the problems existing in the cost control, and to explain the cause of deviation.Finally, in view of the project to be found in the emphasis and difficulty of organization and management, construction technology, project cost management present situation and the existing problems and the problems and causes in construction cost control analysis, improve and establish a scientific and reasonable project cost control system, optimize the project cost control management system, attach importance to the whole process of construction project cost dynamic control, strengthening the construction of informatization of four aspects of the improvement measures of the construction project cost control.This article research, aimed at the current enterprise in some of the problems existing in the project cost control, through different methods of cost management, implement effective exploration can be used to guide the engineering project cost management measures, in order to similar project cost control and management to provide important reference basis.
Keywords/Search Tags:Engineering project, Cost control, Earned value method, Deviation analysis
PDF Full Text Request
Related items