PAMPA International EPC Power Plant Project Risk Management

Posted on:2017-05-14Degree:MasterType:Thesis
Country:ChinaCandidate:J YuFull Text:PDF
GTID:2272330485477443Subject:Industrial engineering
Abstract/Summary:PDF Full Text Request
The EPC has characteristics of fast construction speed and relatively low cost in recent years by more and more owners sought after, but this model also exist such as the one-time construction, the project implementation of environmental uncertainty, project management and implementation of the main management deficiencies, and other factors, the EPC project there is a greater degree of risk. But with the recent EPC mode in China gradually turning to abroad, the EPC project risk prevention is a key problem in domestic and international general contracting enterprises need to pay attention to the. To this end, the Shandong Institute of Brazil PAMPA coal-fired power plant EPC project as an example, the problems of risk management are studied in detail.Through the study of this paper can be seen:(1) the EPC project in China showed a rapid development of the state, but in the process of its development for risk management still exists the risk management system is not perfect, risk management responsibilities dispersed, lack of specialized management, risk management of technical means backward, project risk management personnel lack of professional level is not high the problem; (2) this can be seen in the Shandong hospital PAMPA coal-fired power plant EPC project risk identification process, the risk is mainly manifested as:natural risk, political risk, social risk, economic risk, management risk, technology risk from 6 aspects; (3) the Shandong Institute PAMPA coal-fired power plant EPC project the risk assessment model is established by using the FAHP method, and the evaluation results show that the overall risk of the project in the evaluation grade set in And other status, but also according to the comprehensive score found that the technical risk is higher than other risks. (4) according to the results of risk identification and evaluation, this paper puts forward corresponding countermeasures and suggestions from three aspects:various risk prevention measures, risk control measures and risk management safeguard measures.
Keywords/Search Tags:EPC, risk, identification, control
PDF Full Text Request
Related items