Font Size: a A A

Research On The Progress And Quality Management Of The Comprehensive Wiring Project Of Luzhou Municipal Procuratorate

Posted on:2017-02-01Degree:MasterType:Thesis
Country:ChinaCandidate:D YangFull Text:PDF
GTID:2272330485985164Subject:Project management
Abstract/Summary:PDF Full Text Request
With the acceleration of the process of social information,people have changed the concept and requirements of modern architecture. The emergence of intelligent building has injected new concept and has become the direction of modern architecture.Intelligent building is the product of intelligent building technology and new information technology,it uses the method of system integration,the intelligent computer technology, communication technology information technology and architecture art, through the automatic monitoring, the information resources management and the user’s information service and its function and architecture optimization combination,to obtain more reasonable investment,and it is safe,efficient, comfortable,convenient and flexible.. The integrated wiring system is the basis and precondition,it is the nerve center of the intelligent building,and it plays an important role in the construction of various system resources.This paper introduces the development status of the integrated wiring system, the basic components of the system,system design and engineering construction should pay attention to the basis of the design principle of the integrated wiring system,the basic principles and methods,combined with the Lu zhou city’s Procuratorate building integrated wiring system engineering examples,discusses the comprehensive wiring system preparation,design,construction,acceptance and other issues. The system design of the integrated wiring system model,suitable for China’s actual situation,has a wide range of adaptability. In this paper,the project management is discussed,and the progress plan of integrated wiring system is compiled. The technical features and the key points of each construction stage are discussed.
Keywords/Search Tags:intelligent building, integrated wiring, schedule control, quality management
PDF Full Text Request
Related items