Font Size: a A A

Research On The Time Management Of SCFTC Large Scale Dance Party Project

Posted on:2017-05-02Degree:MasterType:Thesis
Country:ChinaCandidate:Q PengFull Text:PDF
GTID:2295330485486384Subject:Project management
Abstract/Summary:PDF Full Text Request
Project time management is one of the contents of project management, which is mainly for the time for project planning, for key project content, human resource and material of reasonable allocation, ensure the project according to the scheduled time to finish at the same time, as far as possible do save resources and improve the project.Just as interest in the concept, research on the project time management is not much,and the researches are mainly focused in the time of construction project management,for the dance party and other entertainment project, time management has yet to emerge.Based on the large-scale song and dance show project time management importance and the lack of current research, this paper intends to study the film and Television Institute of Sichuan large-scale song and dance show project time management, with literature method, theoretical method and investigation method as the research object, through in-depth Sichuan school of film and television survey and time management to hold the large entertainment projects, project schedule and the actual results are compared, analysis of the problems existing in the project time management and cause problems.The study found that the film and Television Institute of Sichuan College Cup model contest project according to the frequency of once every year held in the project time management has a wealth of experience, but because the project organization staff turnover, project time management still exist prior to prepare adequately, time consumption and actual competition, personnel lack of experience, lack of emergency measures resulted in game time and expected time error. To solve these problems, first of all, the organization department should improve attention for the project time management, to improve the management system, increase for staff training, so that relevant personnel has sufficient capacity to undertake corresponding work; in addition,it should be to establish project dynamic pipe system and comprehensive time management system, establishment of ex ante and ex post audit system, ensure project management and time management give full play to.Research to find the problem- Analysis of the problem- to solve the problem of the idea, in view of the specific project time management problems, put forwardcountermeasures. The results of the study can not only make up the project time management theory research, also can guide students similar project time management in an orderly fashion, show the theoretical and practical significance of research.
Keywords/Search Tags:project, time management, schedule control, entertainment project
PDF Full Text Request
Related items