The Study Of Construction Costs Forensic Science

Posted on:2016-08-02Degree:MasterType:Thesis
Country:ChinaCandidate:W X ZhaoFull Text:PDF
GTID:2296330461450531Subject:Law
Abstract/Summary:PDF Full Text Request
The rapid development of China’s real estate industry can be said that the interests and challenges, while booming, some problems have become increasingly serious. Growing construction disputes case is one of them, including disputes relating to the project cost is accounted for a larger portion. Because of this, the project cost is a problem hearing Forensic building construction price disputes often face in their appraisal conclusion is mediation in such cases, an important basis for the judgment or decision directly affects the results of such cases. However, the current regulations are basically related to Forensic forensic document retrieval class, but the class because of the special nature of the project cost with the forensic identification document retrieval class is different. Forensic study of the project cost is currently still in its infancy, which makes the identification of persons in the course of Forensic among often unable to follow, no guidelines to follow, the identification is more to follow past experience.The cost of Forensic process engineering, the program is as important as the entity. The program should be fully respected the rights of the parties in the litigation process of identification, such as the choice of accreditation bodies, consultation and appraisal fees, and the scene, organize a hearing, identification and other relevant procedural rights oversight. Program throughout the whole process of being identified. Substantive rights related to the construction price appraisal conclusion is clear, is closely related to the realization of the legitimate economic interests of the parties. To ensure a fair appraisal, fair, both to make the program transparent, open, but also to ensure the impartiality of the entity content, so you can become expert conclusions convincing and can be court admissible evidence. In this paper, the court in the judicial system identification process procedures for identifying emerging practice procedural and substantive problems, explore and analyze how to further address and improve the judicial appraisal of the project cost. This is a legal issue, depending on how the courts to exercise judicial appraisal procedures to ensure proper procedures, the proper entity to provide effective protection, it is also a question of professional technology, relies on social engineering cost consulting organization and good management to improve the professional quality of the project cost in order to ensure a good identification of the conclusions of the technical, reliability and impartiality.
Keywords/Search Tags:Forensic Science of Construction Costs, Procedure Impartiality, Identifying Right, Regulatory, Consummate
PDF Full Text Request
Related items