Font Size: a A A

Research On Private Partner Selection Of PPP Mode For Quasi-operational Urban Infrastructure

Posted on:2015-06-22Degree:MasterType:Thesis
Country:ChinaCandidate:X M DuFull Text:PDF
GTID:2309330422971996Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
For the advantages of easing the financial pressure, increasing public oodssupplying efficiency, PPP mode is favored by the governments in our country. With thePPP is More and more widely applied in the field of infrastructure, the research of PPPapplication has also become a hot spot in the field of infrastructure select privatepartners belongs to the procurement. But most of the existing research results are referto engineering contractor selection method and standards, more focus on scheme, noreaction for the characteristics of quasi-operational infrastructure. Therefore, establish apartner selection mechanism with the characteristics of quasi-operational infrastructure,as well as reactinging China’s actual conditions, is very important for selecting privatepartner of PPP for quasi-operational infrastructure①Firstly, the "basic theories" part, the paper defines the connotation of the PPP,and Through project distinguish theory, it has been clear about the meaning,characteristics of quasi-operational infrastructure and the unique characteristics of PPPmodel for quasi-operational urban infrastructure projects, and then discussed the role ofpartner, flow path and the principles of concessionaire selection,combining with theconcept of partners.②Secondly, the”Index selection”,the paper screened indicators dimension, thepreliminary36indicators by a large number of literature reading and analysising thecharacteristics of quasi-operational urban infrastructure.Then with the method ofquestionnaire, to investigate the opinons of personne with working experience,thenanalysis the datas, by SPSS19.0,statistical software. Through the mean test, analysis ofvariance,relativity analysis and reliability test, this paper get the final21optimizationindex. the” Determine the index weight coefficient”, Through the questionnaire marksdata, this paper introduced the objective empowerment method of entropy weighttheory, then calculate the weighted value of each index, sort it,and analyze results.③Finally the “establishethe fuzzy comprehensive evaluation model”,the paperusing fuzzy synthetic evaluation method to build a multi-level fuzzy comprehensiveevaluation model,and then verified the practical and scientific of themodelchongqingthrouth the Chongqing Olympic investment case.
Keywords/Search Tags:Quasi-operational infrastructure, PPP model, private parterner selection
PDF Full Text Request
Related items