| In recent years, with the rapid development of China’s economy, the process of urbanization is accelerating. City infrastructure and housing construction will be important components of urbanization process. BT model is a new form of investment and financing in the society. This form will benefit every project in the development of city. In the construction of public infrastructure, BT model is not only relieve the pressure of government, it also plays an important role in broadening the financing channels and innovating the pattern of financing.As an extension of BOT model, BT model is very mature in foreign countries. The time of this model applied in China is not long, and it is at the stage of growth in China. At present, the BT model project is not widely used in our country. Though for government and investors, this model is beneficial to each other. However, the risk of this model potentially exists. So, the topic about how to manage the risk of BT model financing program is so valuable.This paper bases on the data of’Chengdu Anren Wenbo’program, uses the theory of risk management of BT mode financing construction, establishes an evaluation system of risk indicators. Eventually, this paper gives some advice about risk management in BT mode financing.This paper consists of five chapters. The structure and main contents are as follows.The first chapter is introduction. This part firstly discusses the research background and research significance of this paper. Secondly, it tells the research achievements of BT mode. Last, this section introduces the research methods and the structure of this paper.The second chapter is fundamental analysis of BT mode. This chapter firstly discusses the basic concepts and process of BT mode. Then it compares the differences between BT mode and other modes.The third chapter is risk analysis of BT mode. This section discusses respectively about the source of risk, the recognition of risk and the management of risk. Then it induces some method for risk recognition, and selects a method called Fuzzy evaluation. This method can be used in the next section.The fourth chapter is empirical analysis of risk management for investors. This part bases on the data given in the passage, and uses the fuzzy evaluation method, eventually evaluates the risk of the BT mode program. In addition, it finds out the specific risk factors of the program.The fifth chapter is conclusion and expectation. This part summarizes the conclusion of this paper. Also, it extends the conclusion. Last, it tells the weakness of this paper and how to improve the topic in the future. |