Risk Prevention Of Contract Management During The Construction Of 100000 Tons TDI Project

Posted on:2015-01-25Degree:MasterType:Thesis
Country:ChinaCandidate:N WangFull Text:PDF
GTID:2309330464974454Subject:Business Administration
Abstract/Summary:PDF Full Text Request
YinGuang company 100000 tons of TDI project with long construction period and large investment, the characteristics of the far-reaching, the project construction plays a vital role for future survival and development of the company. Because of project construction is susceptible to site construction conditions, natural environment, social environment and the influence of market economy, the existence of the risk in the process of project construction is very common. At the same time with the extension of construction scale, complex technology and the fierce market competition, the increasing degree of risk, project participants,especially the owner, inevitably face with all kinds of risks. These risks can make project increase investment or losses, even can make project pause, stop, so, in the process of project construction, risk management and prevention is one of the important topics.For the construction of a project of modernization, can be through signing and implementation of a series of contracts to ensure to achieve the goal of the project, therefore,the contract management is the core of the modern construction project management.However, in the process of project contract management, not only faces the risks of project management, also faces the contract management system, bidding system, supervision system is not perfect, and the low level of intellectual property management of contract risk itself.Through the analysis and identification of risk factors of contract management, to prevent risks positively and effectively, can not only to perform the contract, and to achieve the goal of construction project under the environment of contract management, prompt the reasonable allocation of internal resources, carry out the overall project management around the contract.Thus project construction contract management and risk prevention is one of the important management means.In this paper the construction of 100000 tons of TDI project contract risk management as the research object, from the perspective of project owner and the YinGuang company existing contract management combining with 100000 tons of TDI project, identify risk factors existing in the contract management. Further, introduce the techniques and methods of risk assessment to evaluate risk factors about 100000 tons of TDI contract for construction project, concludes that the major contract risk factors existing in the project construction,moderate contract risk factors and the slight contract risk factors.On the basis of the risk assessment of project construction contract, respectively from the bidding risk management, great importance in the process of project construction contract risk management, perfect management system and procedures, and contract risk-sharing mechanism five aspects describes in detail, hopes as contract management as the attachment,increasing 100000 tons of TDI contract execution rate of construction projects, and throughcontrolling the safety of the project, progress, cost, quality goals, reduce project construction risk and loss, ensure project achieve expected benefit.Hope that through this topic research helps improve the perspective of 100000 tons of TDI construction project management department and the understanding of contract risk management, strengthens the consciousness of relevant personnel of contract risk management, improves the contract risk identification, assessment and prevention capacity,reduces risk, provides some useful reference in the process of project construction contract management, guides the construction of 100000 tons of TDI project and for the domestic kind project.
Keywords/Search Tags:risk, contract management, risk assessment, risk prevention
PDF Full Text Request
Related items