| One of the most important aspects of Daqing Oilfield materials procurement efficiency supervision as the enterprise efficiency supervision, from the perspective of business management, monitoring the effectiveness of a procurement is an important embodiment of enterprise supervision function, perfect the management of the procurement business, error correction, reduce losses, save money trap, increase efficiency, improve internal control plays a positive role, avoid or reduce the material procurement, dereliction of duty dereliction of duty and other violations, monitor the effectiveness of procurement management is an important means and effective way to strengthen supervision, plug the loopholes, improve the standardization of management; on the other hand the material procurement management to monitor the effectiveness of project management can improve the efficiency and quality of efficiency supervision, more effective the effectiveness of surveillance results play a role, to play the role to strengthen the effectiveness of surveillance management. In the above two kinds of circumstances, Daqing Oilfield materials procurement efficiency supervision project management standardization system and measures study is a subject worthy of serious study.Taking standard management of efficiency supervision project of Daqing Oilfield materials purchasing as the research object, the research task is carried out by using comparative analysis, field investigation, normative study and empirical analysis, combining qualitative analysis and quantitative analysis and other research methods. The main content of this paper includes four parts: one is introduced the research results at home and abroad, oil procurement efficiency supervision project standardization management research ideas and the development trend in the future; two is elaborated in Daqing Oilfield materials procurement efficiency supervision Specification of basic science management theory, from the standardized management concepts, principles and related noun distinguishing angle are introduced; the three is described the characteristics and problems of Daqing Oilfield materials procurement efficiency supervision of the project, to monitor the effectiveness of project management standards of Daqing Oilfield materials purchasing work analyses the current situation and problem, put forward to provide the basis for Daqing Oilfield to monitor the effectiveness of standardized management system and measures; four is for the Daqing oilprocurement efficiency supervision project of standardized management of the specific situation and task, put forward the concrete countermeasure system and method, combined with the actual case, the concrete application of further elaborates the management measures of Daqing Oilfield materials procurement efficiency supervision project specification. |