Font Size: a A A

Analysis Of The Key Issues In The Coustruction Of The Project Financial Evaluation

Posted on:2015-05-16Degree:MasterType:Thesis
Country:ChinaCandidate:X P WuFull Text:PDF
GTID:2309330467458404Subject:Project management
Abstract/Summary:PDF Full Text Request
This paper analyzes the key problems of the financial evaluation of construction projects, Authors believe that the construction project should pay attention to the underlying data access and computing. This process requires technical and economic cooperation in order to achieve analysts, relationship-based data analysis and practical needs of its estimates between tables were finishing.Secondly, the paper argues that due to limitations based on various estimates and projects around the cause of pre-conditions for estimating construction costs of other difficult to do accurately, and thus calculate other costs of construction were clearly, fourth, the relationship between the discount rate and cash flow were analyzed, considered to be a clear risk factor risk factors and cash flows included in the discount rate selected when the forecast included, to be matched between the two. That is in accordance with the principles of the discount rate and cash flow must be matched with each other, through the conduct of the risk factors included in the analysis both to improve the degree of match between the two data, and ultimately greatly improve the reliability of economic evaluation findings.
Keywords/Search Tags:Basic data, Risk analysis, Construction of other charges
PDF Full Text Request
Related items