Font Size: a A A

Datang (Chifeng) Renewable Power Co.,Ltd Information System Basic Platform Intensive Construction Model Research

Posted on:2016-08-30Degree:MasterType:Thesis
Country:ChinaCandidate:J ZhuFull Text:PDF
GTID:2309330467997617Subject:Operational management
Abstract/Summary:PDF Full Text Request
Wind power enterprise’s information construction work is in its infancy, windpower enterprise informatization construction work should be carried out only inspecification and orderly, wind power and thermal power enterprise’s informationconstruction difference is very big, is not deployed for information construction, thepoint more wide surface is an important characteristic of wind power enterprises,because of a wind power companies at the same time may consist of severalsubordinate wind farms, and distance is relatively far, should how to configure thenetwork configuration structure can meet the current and long-term demand forinformatization of enterprises. The establishment of the correct structure of thenetwork configuration is the solid foundation on which future informatizationconstruction enterprises, a strategic view of macroscopic perspective constructiondirection, will improve the construction speed of maximum, the greatest degree ofsaving construction cost, so that the follow-up in the implementation of the relevantinformation of the construction of the project when there will be no repeatinvestment, basic platform construction planning should fully consider differentdepartments within the enterprise information demand, establishing a comprehensiveenterprise information platform, to avoid the appearance of information island andtechnology board.This is a most wind power enterprise facing the same problem at the beginningof the informatization construction. This article will combine Datang (Chifeng)Renewable Power Co., Limited information construction on the practical workrelated to the above problems, combining the enterprise’s actual situation, analyzed the significance of enterprise information system platform intensive constructionmode. To optimize information resource configuration, improve the efficiency ofmanagement and production efficiency.Datang(Chifeng)Renewable Power Co.,Ltd Information System Basic PlatformIntensive Construction Model Research.Is not only a technical problem, but also amanagement problem. Support the business ability of management to ascend, will befully implemented corporate level of the integration of information resources anddata information security controls.Specification based platform construction of information system, to strengthenthe enterprise’s own management ability and improve the competitiveness ofenterprises is of great significance. Datang (Chifeng) Renewable Power Co., Limitedinformation related work is also from exploring stage to the stage of development,which also left some detours, its reason is various, but a very important reason isunreasonable in the construction of information system platform, as the basis ofinformation system is the most important platform construction, the construction ofenterprise in the early to its reasonable value degree is not high, there are seriousdesign flaws, cause subsequent corrective huge difficulty, not really carried out inaccordance with the enterprise demand for informatization of medium and long-termplanning and design, causes the enterprise information construction investmentcaused a lot of waste. Information system platform, therefore, intensive constructionmodel is the key to the construction process of carding and optimization, based onthe process reengineering based platform construction mode, establishinginformation system solutions for the construction of foundation platform intensive,and the implementation steps and matters needing attention of program is explainedand analyzed. Analysis and research the company information system basic platformneeds intensive construction mode, gives the corresponding mode of thestandardized construction, and to determine the solution. Has been in place through the transformation project of problem analysis and reengineering construction mode,establishing suitable foundation platform intensive construction model of processinformation system, Optimization can solve the following problems: equipment linkbuilding form influence entire network structure; The overall reliability problems ofthe network; To solve the regional management information and production controlsthe protection of the regional network data service defects; To solve the regionalmanagement information and production control in access layer device single thesafety of the road network structure.Finally, combined with the production data of the double link design idea,construction of information system platform intensive mode reflects the security,stability, economy and so on, to analyze its effect, and eventually promote theDatang (Chifeng) Renewable Power Co., Limited information management level, forthe company’s overall information system foundation platform construction to set upstandards and specifications.
Keywords/Search Tags:Wind Power Generation Enterprise, Informatization, Infrastructureconstruction, The double link
PDF Full Text Request
Related items