Font Size: a A A

Research On Tacheng Border Town Development Project Implementation And Management Of ABD

Posted on:2015-08-27Degree:MasterType:Thesis
Country:ChinaCandidate:W ZhouFull Text:PDF
GTID:2309330470470155Subject:Rural and regional development
Abstract/Summary:PDF Full Text Request
From 1987, our country began to use the ADB loan, the ADB is already loans accumulated the second big borrowers.In the practice of using the ADB loan for many years, gradually formed a relatively complete system of planning and management.Since 2006, xinjiang used the ADB loan project had been implemented six periods.The Project of Borrowing Loans from Asia Development Bank to develop the Countryside of Tacheng in Xinjiang Uygur Autonomous Region in xinjiang is the 6th period, with a total investment of 1.706 billion yuan, total project investment by the ADB loan of $150 million, local matching funds is 806 million yuan, Construction Sites on Tacheng, E’min County, Tuoli County, Yumin County in Tacheng, The project involves the road construction, water supply engineering, drainage work,centralized heating engineering and river regulation engineering.This article through to the ADB into border town development project research, contrast the ADB project with the domestic similar projects in the planning stage, preparation stage, implementation stage, project post-evaluation stage phase comparison and overall comparison, found the ADB project while in earlier than the domestic similar project of examination and approval formalities trival, cause the preparation period sustain longer, the ADB project in the field research, public participation, project supervision, project post-evaluation has strong advantages, combined with the domestic project management program gradually standard and the ability of the project management, strengthening the domestic project planning guidance, strengthen the supervision of project implementation period, establish and improve the project evaluation system.
Keywords/Search Tags:Project, The project management, Phase contrast
PDF Full Text Request
Related items