Construction Project Cost Control Research And Budget Stage Settlement Forecast

Posted on:2016-08-14Degree:MasterType:Thesis
Country:ChinaCandidate:L WangFull Text:PDF
GTID:2309330482451642Subject:Project management
Abstract/Summary:PDF Full Text Request
This article from reconstruction project cost control subject-owners to carry out cost control perspective, this paper expounds the cost control from the basic concepts to aided counterparts in area under the jurisdiction of the first batch of Pilot Projects Aided:XI middle school project, X2 social assistance demonstration center project, X3 training base construction design engineering, X4 building project as the background and the object of study, to project construction cost control theory as a guide, explore and study in construction project feasibility study stage, design stage, bidding and tender stage, construction stage and completion settlement stage of cost control experience.The key to the success of the project is whether the construction cost control to achieve the goal, to achieve the desired economic and social benefits. Therefore, it is necessary in the engineering cost control of the basic theory, to each stage cost control to carry on the thorough research, and combined with the reconstruction of the phenomenon of phase separation of the prevalent in the field of construction engineering technical-economic situation and investment out of control, using relevant theories and research results, for in practical work in how to carry out effective cost control work carried out an empirical study on methods to explore.The main research contents and achievements of this paper are as follows:(1) by reading and analyzing domestic and foreign project management related literature, summarizes the domestic project cost control advantages and development status, the cost control system absorbed in today’s engineering cost control mainstream in the field of the control idea, highlight the cost control in the reconstruction of the importance of the project management process. Description and analysis of the construction project cost control of the main content, reflects the particularity of the construction project.(2) according to aided pilot project each stage cost control situation, through the questionnaire survey method, brainstorming and other relevant theoretical investigation, analysis, with particular emphasis on the reconstruction of engineering project cost control problems.(3) in the reconstruction project cost control necessity analysis, through the questionnaire survey method, brainstorming, Delphi method, the paper gives the reconstruction project cost control factors and establish the index system of cost control, the construction project cost "s" curve diagram focuses on aid project construction stage of cost control, and to determine the effects of predictor values of settlement value, and gave the corresponding aid projects predict the settlement price of the model in the stage of the budget.(4) to further verify the model feasibility and applicability, this paper to another reconstruction projects, X5 high school changed expansion project as an example, based on the above model, to establish the prediction index of settlement influence value, the project settlement stage construction cost prediction, guide construction budget stage of adjustment, eventually for the settlement stage of cost control made good effect.Through questionnaire survey method, mind storm method, Delphi related theoretical research, and reconstruction projects practice obtained in test to explore the method, establish a unified, coordinated, orderly cost control management system provides the theory and the practice of new ideas, reconstruction project for the future of this special type of government investment project cost management, to carry out cost control provides theoretical support and reference.
Keywords/Search Tags:The reconstruction project, Cost control, Main factor, Index system
PDF Full Text Request
Related items