Font Size: a A A

Research On Investment Risk Management Of A New Medical Building Construction Project Of Yantai Seaport Hospital

Posted on:2016-02-07Degree:MasterType:Thesis
Country:ChinaCandidate:W DuanFull Text:PDF
GTID:2309330482464831Subject:Project management
Abstract/Summary:PDF Full Text Request
With the development of society and the improvement of people’s health awareness, the demand for medical services is increasing, and the competition among hospitals is increasing, not only in the quality and quantity of technical personnel, but also in the hardware level. A modern general hospital, only the level of infrastructure, to have a solid backing. The building of the new medical building is an important measure to meet the needs of the hospital development and meet the needs of people, with the broad market prospects and higher social significance. In this paper, the research object is based on the new medical building construction project of Yantai seaport hospital. Through collecting the relevant information and documents about project management and risk management, this paper studies the related current situation of hospital construction project risk management.This paper is divided into seven parts:first, the research background and significance, the domestic and international literature review and summary, and describes the research content, methods, technical route and structure arrangement, two is the general theory and method, including uncertainty analysis theory, risk analysis theory and common risk evaluation method; three is the background and necessity of Yantai port hospital information, the advantages and disadvantages of project construction, project construction; Four is the project investment risk identification, the characteristics and risk characteristics of the project has a clear definition; five is the focus of this paper, including the investment cost of the project and other financial data to estimate, and use these data to analyze the risk and the sensitivity analysis, and finally focus on the use of Fuzzy analytic hierarchy process to evaluate the risk of investment risk evaluation results of Yantai port seven is summarized and prospect. In the theory of risk, risk identification process is generally divided into four steps:risk identification, risk estimation, risk assessment and risk response, which is the main research context of this study. In the research methods, the use of the uncertainty analysis method, analytic hierarchy process and fuzzy evaluation method are used in the research.From the research results, the profit and loss balance method can recover the initial investment, more than 58.18% of the profits of the project, the three most important risk factors for the project, the three are the 69.81% main risk factors, the fuzzy comprehensive evaluation method to draw the project’s risk is 3.53765, belonging to the medium risk level. In order to effectively deal with all kinds of risks, a series of countermeasures are put forward to ensure the financial statements are carefully and timely, to improve the capital mobility, to build a professional risk assessment team, in order to have a certain guidance and reference for the successful completion of the project.
Keywords/Search Tags:Project investment risk, Risk management, uncertainty analysis, analytic hierarchy process, fuzzy comprehensive evaluation
PDF Full Text Request
Related items