Font Size: a A A

Construction Of The New District Of GZQY Industry Research

Posted on:2017-03-31Degree:MasterType:Thesis
Country:ChinaCandidate:J C HuangFull Text:PDF
GTID:2309330503485659Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years, China’s regional economic development gap becomes larger and larger, in order to realize the balanced development among different regions of the province, seeking new space for industrial transfer, to promote the transfer of industry, the government enacted relevant documents to promote the eastern northwest industrial park expansion efficiency, create a good policy environment for Guangdong’s industrial transfer and industrial park development and construction. Based on Guangzhou clear counterpart in Qingyuan City, cooperate to build GZQY industry transfer area.Based on above the starting point and the object of study, this article uses the literature search method, field survey method, PEST analysis method to study. This paper mainly focuses on the development and construction of the GZQY industry in the development and construction of the positioning, land acquisition and relocation, the administrative examination and approval management, investment estimation and risk analysis. At the same time, conceives the reform of the government implement the system of administrative examination and approval of the proposed model.The study found that the positioning of the GZQY industry transfer zone should be a platform for the exchange and cooperation and industry transfer. In order to better use and response to the counterpart assistance policy, to establish a financial settlement, the exercise of municipal level approval authority, form and improve the full authorization, closed management "," business zone "one-stop service system, and actively promote the" production city fusion ", and further promote the economic development of Qingyuan region.The main problem in the land demolition levy demolition area, the original houses and factories, the delay time, emerged a remodel and addition. In view of the above situation, the relevant solving countermeasures are proposed in this paper, firstly 2-3 block is reserved for the commercial and industrial center in the starting area of lots of blocks to set aside as a collective land use to return, and the implementation of compensation in the development of collective economy mode, to solve the problem of farmers living and development; secondly the establishment of the demolition of the ownership of administrative compensation system to determine the area, clear open, fair, reasonable; the third is to increase the propaganda efforts, allowing people to fully understand the resettlement policy, and clear the levy demolition compensation and resettlement method, clear after the demolition of the long-term interests, to help them solve their immediate problems.The main points of the reform of administrative examination and approval management lies in the "approval light, heavy in management". In having a municipal level approval authority, the implementation of "full authorization, closed management, the planning of the project, approval of construction were integrated and optimized. Especially in the planning approval, the division of the industrial and non industrial, industrial projects for the examination and approval procedures and time limit of compression, so that the original approval time from 50 working days reduced to 21 working days. For enterprises, to seize the summer & autumn golden period of construction. to accelerate the completion of the benefits have a great help.By estimate, the new district in the first two years of development and construction of fixed with a total investment of about 1.05 billion yuan, including 240 million yuan in 240 million yuan, the earth is flat and level demolished and relocated on requisitioned land, road network and municipal facilities of 530 million yuan, and a sewage treatment plant(including sewage pipe network) to 160 million yuan. According to the admission threshold estimates to obtain economic benefits: the expected 2017 the annual industrial output value 654.2 billion industrial of 196 billion yuan, annual tax 21.58 billion yuan; to 2020 years to achieve an annual industrial output value of 160 billion yuan, industrial added value of 400 million yuan, annual tax 5.28 billion yuan. Construction and operation period of the main risks in the continuous adjustment of the land use policy risk, business operation of market demand and price changes, financing interest rate and foreign exchange rate risk, and is similar to the industrial transfer District continue to emerge, no doubt exacerbated the investment of fierce competition.Also GZQY industrial transfer new political, social benefits mainly reflected in: effect of the construction of the new district is the most direct is to drive economy, increase local government fiscal revenue, generate economic benefits, reflect is external, invisible to the whole society created good social and economic benefits, such as providing employment opportunities for the society, improve people’s way of life and so on; and after the completion of the new district will have a large number of high-tech enterprises to enter, not only for the local economy transition, optimize the industrial structure has positive role in promoting, and it will attract a large number of technical and management personnel gathered, regional innovation and technical innovation ability will be strengthenedThrough the study of the above five aspects analysis, made industry of GZQY transfer district leaders and managers who in the early stage of construction recognize district planning positioning, industry positioning, land acquisition, government administrative examination and approval system, investment estimation and risk analysis, comprehensive benefits are a series of problems, find the industry transfer of the advantages and disadvantages of the New District, position themselves correctly, to lay the foundation for the new steady booming. Notice at the same time proposed the countermeasures and optimization scheme can provide some references and help for the transfer of other industries in Guangdong Province Industrial Park construction and management, has a certain reference significance.
Keywords/Search Tags:industrial transfer, planning and industry positioning, land acquisition and relocation, administrative examination and approval system, investment estimation, risk analysis, comprehensive benefits
PDF Full Text Request
Related items