Font Size: a A A

Study On The Quality Management Of Construction Engineering Project

Posted on:2016-04-03Degree:MasterType:Thesis
Country:ChinaCandidate:W F SuFull Text:PDF
GTID:2322330485459596Subject:Project management
Abstract/Summary:PDF Full Text Request
Quality construction project is participating in the construction of all parties concerned, it is not only related to the use value of life and the use of functional construction projects, but also related to national interests and the lives of the masses.Therefore, to carry out the project quality management research is very necessary.Based on the theory of project quality management of the existing, draw lessons from the foreign scientific and effective project quality management measures, Wenchang space launch resettlement project field space supporting area as a case, through the combination of theory and practice, formed from the engineering quality comprehensive study of the whole process, the point of view, the quality management our project is analyzed in detail. The main content of this paper is: the first chapter is the introduction. Mainly introduces the research background, the research significance, the domestic and foreign engineering project quality management, including the field of the research and the purpose of this study and research methods. Secondly, mainly expounds the basic theory of project quality management, at the same time, the principle of construction project quality management and project quality characteristics to do a brief analysis. Then, from the formation of project quality, comprehensive study of the whole process of angles, in-depth analysis of the project quality management, at the same time, the statistical methods of project quality management is analyzed. Finally, in Wenchang Aerospace emission field space supporting immigration resettlement project quality management as the research case, through summing up the instance analysis to carry on the research on the project quality management. Main research contents are: the stages of the formation of construction project quality quality management, including project preparation stage of quality management, the construction phase of the project quality management and project completion acceptance stage of quality management; project mainly shadow ring factors of management measures, including measures of human resources management, machinery and equipment management, materials management, construction management measures, the quality control measures of the construction environment and practical operation factors of quality management measures.Characteristics of the project itself has the complexity of engineering project quality management, and arduous. To achieve the desired goal of project quality management, must use scientific and effective management methods, formed from the engineering quality and comprehensive study of the whole process, angles, the implementation of strict management of Engineering project.
Keywords/Search Tags:engineering projects, quality management, resettlement project
PDF Full Text Request
Related items