Font Size: a A A

The Second Humen Bridge Anchorage Foundation Construction Quality Risk Prevention And Control Measures

Posted on:2016-10-10Degree:MasterType:Thesis
Country:ChinaCandidate:J H LiFull Text:PDF
GTID:2322330485479381Subject:Engineering
Abstract/Summary:PDF Full Text Request
According to the domestic, foreign experience, as the preferred type of long-span bridge suspension bridge, just completed the construction of suspension bridge anchorage foundation is more and more used in retaining structure; the retaining structure of anchorage foundation relates to the foundation treatment, even the wall into the groove, lining and soil excavation the core concrete construction link, the top and bottom of large volume concrete construction, fill in anchor foundation, and a longer duration, the construction process is easy in the project risk management caused by various defects, once an accident occurs, often the huge social impact, and is bound to the project itself from the manpower, financial resources or other resources cause great loss. In this paper, with the title of Humen Bridge Project anchorage foundation in the construction process of quality risk prevention and control, to enhance the anchorage foundation in the construction process of risk control efficiency, reduce the risk faced by the construction enterprise quality.In this paper, the research object of Humen Bridge anchorage foundation construction, the problems faced in the project risk management is more, including prevalent in similar project technical risk (surveying, design, foundation pit lost stability, construction, environment and other risk), policy risk, government policy, construction contracts, etc.) and other risk problem, if we do not pay attention to the effective prevention is bound to cause serious consequences and subsequent devote more resources to make up.The to risk prevention and Countermeasure of the project as the research object is studied by means of project management methods, improve anchorage foundation of risk prevention and control of quality of design and optimization of management, and to achieve the dynamic risk management and efficient construction of equilibrium. And in order to promote the domestic similar anchorage foundation engineering used in the project practice, not to increase the resource utilization of project management methods, in the premise of ensuring the quality and the project to promote efficient, saving resources for enterprises.
Keywords/Search Tags:Suspension Bridge, Anchorage foundation, Construction quality, project management, Risk prevention and control
PDF Full Text Request
Related items