Font Size: a A A

Masonry Concrete Gravity Dam Engineering Design Analysis

Posted on:2017-08-02Degree:MasterType:Thesis
Country:ChinaCandidate:Q G FengFull Text:PDF
GTID:2322330512450801Subject:Water conservancy project
Abstract/Summary:PDF Full Text Request
Pu 'an building waste field reservoir in guizhou province, can solve QianXiNa traditionally present situation of water scarcity, agriculture and farmers to improve the lives and living conditions of farmers in poverty-stricken areas and promote the development of local agricultural economy.Pu 'an wild field reservoir is located in guizhou province QianXiNa buyi and miao minority autonomous prefecture in the southeastern city of fog long river, the existing river basin area of 4.61 km2, reservoir total capacity of 1.62 million m3; Irrigation capacity of 1.221 million m3.Recommend to hub arrangement:wild field reservoir masonry concrete gravity dam++ fetching water from a dam body and dam body discharge vent pipe, water supply pipeline.Design content mainly engineering site selection, engineering layout, design of water retaining structure, drainage structures design, water design, etc.Combining with the wild field reservoir, from basic data collection, according to the specification from engineering general layout and dam, the dam axis, building type, foundation design, structure calculation analysis of the masonry gravity dam concrete engineering design process.
Keywords/Search Tags:Guizhou Puan County, Barren reservoir, Masonry concrete gravity, Surface outlet discharge, Bucket energy dissipation, Combination of water supply and water supply, Seepage curtain
PDF Full Text Request
Related items