Research On Project Management Process Optimization Of Gas Engineering Construction Management Company

Posted on:2018-01-17Degree:MasterType:Thesis
Country:ChinaCandidate:X M ShuFull Text:PDF
GTID:2322330512486374Subject:Business management
Abstract/Summary:PDF Full Text Request
Beijing gas Refco Group Ltd is a city gas supply enterprise,under the control of the government administrative service function.Engineering construction management company to assume the task of the group's capital construction.Along with the development of city construction in China entered into the stage of rapid development,and for the premise of the implementation requirements in the national law and the corresponding regulations,the implementation of the construction progress of the project is often not according to schedule,the original internal processes have been inconsistent with the current management requirements,gradually exposed between sustainable development needs typical state-owned enterprises and backward the management level of contradiction.In order to effectively control the construction project construction progress,and gradually improve the optimization of construction company internal management processes,the process optimization theory,using the five dimension analysis method and three factor analysis method to find out the existing core business management process of the company,and the project management,bidding management,contract signing,engineering change and capital payment process status.And then use the process diagnosis analysis to diagnose the key processes.Finally,combined with the process optimization objectives and optimization principles,the management process of the construction company is optimized and the current process is optimized.At the same time in the implementation of the scheme in the establishment process optimization project group,the revised system and organization adjustment,optimization scheme implementation,commissioning and curing steps,a process optimization evaluation system and supporting measures to safeguard system.Through the optimization of the work of the construction company to make internal management process smooth,smooth implementation of the project.Although there are many researches on the process optimization at home and abroad,but for the user is relatively broad,and the construction of the company's corporate background and construction characteristics do not have intuitive reference.This paper will shrink to the municipal engineering construction of gas content of the specific enterprise,make the problem specific,for the similar enterprise management process optimization experience,reference is more.
Keywords/Search Tags:gas, engineering construction, project management, process optimization
PDF Full Text Request
Related items