Research On Risk Early Warning Management Of Construction Project

Posted on:2017-11-19Degree:MasterType:Thesis
Country:ChinaCandidate:Y F LeiFull Text:PDF
GTID:2322330512950801Subject:Project management
Abstract/Summary:PDF Full Text Request
With China's comprehensive national strength growing prosperity, and level of economic development, China's construction industry is also increasingly prosperous. Construction project with respect to the enterprise project, capital intensive, project turnaround time is slow, the quality, progress, safety requirements are very high. Therefore, project risk greatly. At present, construction enterprise in our country to the project risk is getting more attention, project risk prevention and control has become an important research topic in the area of project management. And the construction of engineering project risk early warning system, the project risks nipped in the bud is more significance.Based on the introduction of the engineering project risk management and early warning theory based, this paper build engineering project risk early warning system, discusses in detail the construction project risk forewarning system construction goal, functions and operation modes. Construction project risk forewarning system include:information early warning system, early warning analysis subsystem, prediction subsystem and warning countermeasure subsystem. Risk early warning system can be established on project risk changes and trend monitoring, early detection of risks, timely send a warning signal, thus contributing to the project management are able to effectively guard against and defuse the risks.Engineering project risk early warning system the most important is established can be used to observed data. This paper through hierarchical analysis model project risk early warning indicator system is established. Through the combination of theory and practice method are introduced in detail. The index value of the early warning index system and to determine the index weight determination of. In the early warning system of engineering project issued a warning signal, the need to take corresponding countermeasures and concrete measures are:to reduce the risk, risk prevention, risk transfer, risk avoidance, risk retention and reserve measures.
Keywords/Search Tags:engineering project, risk early warning management, risk management, risk management countermeasure
PDF Full Text Request
Related items