| Baotou Baiyun power supply bureau charged with the task of Baotou municipal Baiyun mining,electricity population of around 22,700,the supply area of 138 square kilometers.With the amount of electricity increases,the traditional manual meter reading has been unable to meet the Baiyun Branch work,Baiyun Branch of the meter reading system has been measured at the transformation,using a system of metering devices far more variable units to achieve a "pay close attention to management,plug the loopholes,and eliminate hidden dangers," 12-character principle,to enhance the level of marketing management Baiyun Branch,reducing the associated loss of power,increasing the economic branch.Baotou Power Supply Bureau Baiyun application of remote meter reading system,pre-installation transform five distribution lines,43 great-grandfather changed station area,79 user box changes,power distribution room,transformer,10 meter high high for households to improve the power system measurement of the level of work.Remote meter reading system with remote automatic meter reading,information and communication,reliable,fast,periodic readings,etc.,can remotely monitor power metering device to achieve the power of information in the remote automatic transmission,the implementation of remote meter data reliably overcharges.In this paper,the quality control theory in Baotou Baiyun Branch metering reconstruction projects were studied,analyzed Baiyun Branch far more than the status quo system,far more than the system of measurement of the project,the division of responsibilities metering renovation projects,far more than the transformation of the quality control system of measurement the content and quality control system metering far more impact on the transformation.Baiyun Branch should pay attention to quality control measurement reconstruction projects,including the division of responsibilities and project construction quality control,quality control funds management,project plan,construction safety,project acceptance,the improved quality control measures that can improve the measurement of the transformation project quality control standards to ensure the smooth implementation of the reconstruction project of the measurement. |