The YTG System Upgrade Project Schedule Planning And Control Research

Posted on:2015-03-30Degree:MasterType:Thesis
Country:ChinaCandidate:Y B SunFull Text:PDF
GTID:2322330518470905Subject:Engineering
Abstract/Summary:PDF Full Text Request
Power dispatching system is an important means to ensure network security,economic,efficient,through the grid scheduling system can realize the load allocation,real-time data monitoring,remote operation,quick accident analysis and decision etc..With the continuous development of YTG enterprises,electricity load increasing,the continuous expansion of network scale,substation(the)26 to increase by 11 of the original,the original power grid dispatching automation system can not meet the demand in power grid expansion ability,reaction speed,data security,function expansion,in urgent need of upgrading the power grid dispatching system.The system of project management theory based on the maturity of the technology,progress plan and control project,combined with the characteristics of power grid operation and renovation projects,research and control of schedule optimization of project scheduling system YTG power system.The reconstruction project of power grid dispatching system has been carefully work breakdown and the network graph drawing,schedule optimization principle and application,research progress control process,and based on the actual proposed countermeasures and suggestions to ensure the implementation of the project schedule.This paper is based on the power grid renovation project scheduling system management,specification and standard analysis and Research on similar projects,has a high reference value.
Keywords/Search Tags:Power dispatching system, reconstruction project, project planning and control, time redundancy, balance method
PDF Full Text Request
Related items