Research On Overseas Traffic Engineering Management

Posted on:2018-08-30Degree:MasterType:Thesis
Country:ChinaCandidate:H WangFull Text:PDF
GTID:2322330518968588Subject:Civil engineering
Abstract/Summary:PDF Full Text Request
Compared with China,the overseas political environment,laws and regulations,personnel situation,economic level and there are large disparities in the implementation of the project management,construction site management,difficult in foreign countries,therefore,should be strictly in accordance with the domestic management experience directly to overseas engineering projects should be combined with the actual situation.The project host country to use[1].Therefore,in order to better ensure the progress and quality of the project,in order to better ensure the progress and quality of the project,it is necessary to strengthen the construction site management of overseas projects and study the effective overseas project management experience.With the rapid economic and social development and the government's strong support,many enterprises in China have to go abroad to participate in international competition.Due to the influence of many factors,such as foreign political environment,economic form,cultural difference,and so on.Therefore,China is now more and more attention to the management of overseas construction site.Based on practice,summed up the analysis of the valuable experience of overseas engineering project construction management,and puts forward corresponding management countermeasures of,in order to offer a reference for similar engineering.Through practical research,sorting out the overseas traffic engineering management method is a system engineering,from the overall design considerations,elaborated the project preparation content,construction technology of subgrade,foundation strengthening treatment technology,pier construction technology,construction technology,construction technology of beam bridge and pavement construction technology,construction technology and seal synovial paver concrete paver central zone construction technology,and study the quality,safety,schedule,cost control measures,emphatically discusses the concrete method of overseas project management and construction,and finally to the case based on introduces the basic situation of sea transportation projects,ready to work,the importance of the preparatory work before construction.Through the study of overseas traffic engineering,summed up a set of feasible management scheme and construction technology,provides the reference for the future of overseas project management,has a certain significance to guide similar engineering projects to enhance the management level of overseas traffic engineering.
Keywords/Search Tags:Pakistan, expressway, construction management, research and analysis
PDF Full Text Request
Related items