Font Size: a A A

Based On The Analytic Hierarchy Process (ahp) Project Tender Control Price Influence Factors Of Research

Posted on:2018-01-11Degree:MasterType:Thesis
Country:ChinaCandidate:D P HuFull Text:PDF
GTID:2322330518973090Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
Since 2008,the concept of "tender control price" has been put forward.The bidding control price has played an important role in reducing the bid,marking and malicious bidding,and improving the efficiency of capital use.But in the actual application of the tender control price of the results of managers and researchers to become the focus of attention.According to the basic process of construction project construction,the rationality of the result of bidding and control price has been influenced by many factors such as construction link,compiling subject and policy,thus affecting the bidding result of construction project.Therefore,the paper points out the influencing factors of the accuracy of the tender control price.Based on the analysis of the current situation and the problems in the process of using the bidding price of construction projects in China,this paper summarizes the investment environment by reviewing the relevant literatures and other methods.At the same time,Project conditions,the industry environment,the level of four aspects of the tender control of the impact of factors.And to construct the initial index of the influencing factors of bidding price.The initial indicators are selected by membership degree,validity test and comprehensive analysis process,and the rationality of the evaluation index of influencing factors is ensured.In this paper,the influencing factors are used to analyze the influencing factors,and the importance analysis model is established by introducing the analytic hierarchy process.The factors influencing the accuracy of the compilation are calculated and the results of the importance analysis are obtained.Finally,In the process of bidding for the development of a commercial residential development project,the author calculates the rationality of the model in practice and examines the rationality of the model and puts forward how to improve the preparation of the tender Measures to control the quality of the price.Through the analysis of the factors affecting the bidding price of the tender,it is possible to make the tender control price prepared by the compiling staff more accurately reflect the project cost of the closest project,so that the tender can better understand the actual project cost and market Price,and control the project price,optimize the investment funds,to obtain better economic benefits.The main innovation of the paper is that,based on the actual situation,the qualitative and quantitative research methods are used to analyze the influencing factors of bidding price.At the same time,the evaluation model established in this paper has universal characteristics and high applicability.
Keywords/Search Tags:Engineering project, tender control price, influencing factors, analytic hierarchy process
PDF Full Text Request
Related items