| This article is based on the Shuohuang Railway as background,depth study of the key technology of 20 thousand tons train marshalling,20 thousand tons of heavy Shuohuang trains,followed by 20 thousand tons of combined train comprehensive test demonstration based on LTE network,and finally puts forward Shuohuang Railway20 thousand tons of passenger transport organization.The Shuohuang railway existing train 20 thousand tons comprehensive test separately from the static state,heavy load,no-load state traction test,braking test,from the control of the locomotive dynamics test,specific location of C80 freight car dynamics test painted made table,data curve,comparison of determined comprehensive experiments is suggested and the optimal solution.From the results of demonstration analysis,the paper put forward the feasibility and 20 thousand train,secondly through lines of research the feasibility condition and key technology analysis of feasibility and necessity,and through the comprehensive experimental demonstration,obtains the comprehensive experiments is suggested and the optimal solution,the determined Shuohuang Railway 20 thousand tons heavy railway traffic organization measures.Because the railway line is long,the line condition is complex,and the key technical condition of the formation scheme is much,and some influence factors are not considered in the analysis of the key technical conditions.In the subsequent operation of the organization will focus on the key sectors of the card control,record and analyze the data,reasonable optimization of the configuration program to ensure traffic safety. |