Font Size: a A A

The Optimization Research For Total Quality Management Of ABC International Plaza Construction Project

Posted on:2018-01-08Degree:MasterType:Thesis
Country:ChinaCandidate:L ShaoFull Text:PDF
GTID:2322330536952797Subject:Engineering Management
Abstract/Summary:PDF Full Text Request
With the development of China,the economy grew up step by step.The market economy mechanism gradually formed and construction had an unprecedented development.As the core of construction project,quality management is the key to determine influence and competitiveness of the market.Total quality management(TQM)means that product quality is the key to an organization,taking full participation,building a scientific and effective quality system.The purpose is to through customer satisfaction and to make the organization and society benefit a long time success.Total quality management is' t a simple management method,it contains the management ideas,means,methods and etc.The main essence of TQM is “3 total” management,means total members,total process and total enterprise.The paper is based on international and domestic researchs,documents,ABC international plaza construction project characteristics and engineering practical experiences.The paper provides a comprehensive overview of TQM and analysis of ABC international plaza project quality management problems.By throughing the method of “3 total” is the key to improve the comprehensive quality management and the ability of construction enterprise.The thesis mainly covers the following details:Firstly,simply introduce background and sense of the thesis;recommend the theory of TQM,including definition,characteristic,basic principles,methods and the application in international and domestic construction projects.Secondly,combined with ABC international plaza project,introduce the major condition,mainly technical specification and standards,project objective targets,construction schedule planning,characteristics and response measures,members.Combined with five factors of questionnaire survey,including the people(operator),material(orginal material),machine(equipment),technique(method)and surroundings(environment),it comes to get a data report.In addition,analyse construction problems including compilation a management planning,total quality management,comprehensive production factors,control measures.Thirdly,on the basis of the principle of "people-oriented",make all people involved,strengthen the quality management education and training,build the rewards and punishment mechanism.Come up with the improvement strategies covers the earlier stage,mid-construction stage and achievement stage.Through make the reasonable comprehensive quality management plan,set up a safety and civilization production system to promote the company quality management.At last,analyze the insufficient of the main research,present a summary and prospect.
Keywords/Search Tags:Construction projects, Total quality management, Total members, Total process, Total enterprise
PDF Full Text Request
Related items