Font Size: a A A

A Intlligent Project Construction Progress Planning And Control Research

Posted on:2018-04-05Degree:MasterType:Thesis
Country:ChinaCandidate:B ZhangFull Text:PDF
GTID:2322330563452654Subject:Project management
Abstract/Summary:PDF Full Text Request
Construction projects are often limited in terms of time and resources,especially in intelligent construction projects are often arranged in the late construction of the whole approach,which will be on the construction process management of the high demands.In the construction process once the management of the negligence,it will not be able to ensure the quality of construction projects and progress,project costs will be substantial growth,and even lead to the project halfway,resulting in greater losses.So the progress of the project management has become an important issue,scientific and rational project schedule management,not only can enhance the construction team's core competitiveness,but also can make the construction enterprises in the highly competitive market environment cut a striking Figure to enhance the overall image of the enterprise and Reputation.This paper aims at A intelligent project,carries on the research to the project construction progress management,uses the earnest value method to carry on the project progress management.This paper expounds the methods and tools of project progress,and analyzes the progress of project progress in the process of project promotion,analyzes the causes of project progress deviation and the way of progress adjustment.First of all,the project progress management theory and construction of intelligent construction stage of the progress of the content and characteristics of management.Secondly,we use the process decomposition method to decompose the work of A intelligent engineering,and combine the usual construction experience and organizational structure to sort the work tasks logically to determine the relationship.Through the collection of project-related resources and data,project time estimates,and then prepare the project schedule to determine the key line.Combined with the data collected during the implementation of the project to analyze the dynamic monitoring,analysis of the deviation in the key work,select the correct corrective measures to ensure that the project completed within the specified period of time.
Keywords/Search Tags:intelligent engineering, construction stage, schedule control
PDF Full Text Request
Related items